亚洲性色永久网址-亚洲性视频-亚洲性视频网站-亚洲性天堂-亚洲性网-亚洲性无码av中文字幕

Hello, welcome to visit Wuhu Yujie Metal Products Co. LTD!?

mobile

Check mobile websites

ChineseEnglish

TEL:

13855314297

News

There is much knowledge in fixing iron nails on wooden squares

Release time:2020-10-13     Time to browse

  Iron nails fixed on the wooden square has a lot of knowledge, let's study the stitching methods of iron nails fixed on the wooden square, what are the different places.

  I. Process principle of plastic formwork project

  The plastic formwork support system integrates the visual advantages of large steel formwork and the advantages of easy formwork and flexibility of wood formwork. The plastic template can be spliced by fixing iron nails on the wooden square directly. According to the size of concrete members, various models can be used in the vertical and horizontal arbitrary connection combination, convenient construction, through the use of special fixture lock, so that the concrete forming size more accurate. By using plastic formwork, the appearance quality of concrete can be more easily guaranteed, and the construction operation is more convenient than steel formwork, wood formwork and bamboo formwork.

  Second, low foaming multi-layer plastic building template production process and operation points

  The production process and operation points of low-foaming multi-layer plastic building formwork belong to the product patent, and have passed the scientific and technological achievements appraisal.

  Open mode:

  1. Control the time of mold removal. Premature removal of molds will lead to wall concrete sticking molds. When the concrete is completely set, the poured concrete will automatically detach from the formwork, making the demodulation process faster and easier.

  2. The removal of formwork must be ordered by the construction technical department. It is strictly prohibited to remove the formwork without permission.

  3. The removal of the bottom die shall comply with the provisions of gb50204-2002 Code for acceptance of construction quality of concrete structure engineering. The working team must apply for the removal of the bottom die before the removal is approved by the technical leader of the project department.

  4, formwork engineering operations should follow the supporting die and mold removal by an operation team, should follow the support to remove the lateral support, then the removal of vertical support and other principles.

  5. After the plastic template is removed, the working surface is clean, and there is no waste such as ash residue, and there is no need to brush the mold release agent on the contact surface with concrete.

  Iii. Materials and equipment

  Materials: low foaming multilayer plastic building formwork, channel steel, Angle steel, wooden square, nails, bolts, rebar, sponge bar.


  • Company

    Wuhu Yujie Metal Products Co. LTD
  • TEL

    +86 13855314297
  • Mmail

    anhuiyujie@outlook.com
  • Address

    Fangcun Industrial Park, Jinghu District, Wuhu City, Anhui Province

Mobile

主站蜘蛛池模板: www中文字幕 | 综合图色| 久久一区 | 欧美成人久久一级c片免费 欧美成人剧情中文字幕 | 男人的天堂免费视频 | 精品视频在线观看一区二区三区 | 激情综合网五月婷婷 | 中国国产一国产一级毛片视频 | 亚洲黄色免费在线观看 | 在线观看深夜观看网站免费 | 在线欧洲成人免费视频 | 伊人色色网 | 亚洲天天做日日做天天欢毛片 | 久久久久久网址 | 亚洲精品久荜中文字幕 | 香蕉蕉亚亚洲aav综合 | 欧美一级毛片aaa片 欧美一级毛片不卡免费观看 | 国产高清成人 | 国产精品在线观看 | 精品国产线拍大陆久久尤物 | 久久久99精品免费观看精品 | 天天草天天草 | 在线观看 一区二区 麻豆 | 老子影院午夜伦不卡 | 五月婷婷之综合激情 | 全部费免一级毛片不收费 | 亚洲国产人成在线观看 | 有码在线 | 国产成人一区二区 | 久热官网 | 亚洲国产香蕉视频欧美 | 免费国产午夜高清在线视频 | 亚洲午夜久久久精品影院视色 | 色视频亚洲 | 日韩久久久精品首页 | 成人黄色在线免费观看 | 国产成人精品999在线 | 综合免费一区二区三区 | 亚洲精品伊人 | 欧美日韩中文字幕一区二区高清 | 国产91精品一区二区麻豆网站 |